TEL:+86(580)2038333
House
Current Location:Home>Others
Remind: your computer time is not consistent with the auction time.please bid early and not miss the best bid time.
 
5030 On-look 0 Followed
Bidding Announcement of “MARIA” Oil Tanker
Auction ending information
   
Start:
2020-01-16 10:00
End:
2020-01-16 11:00
Total bid:
0 times
End price:
$3,100,000
Top bidder:
Ending type:
over
Start price:$3,100,000 USD
Bid Increment:$10,000 USD
Deposit:$300,000 USD
Preemptive person:No
Online consultation
Appraise price:Empty
Bidding cycle:1 hours
Postpone:5 minutes/time
Reserve price:No
Type: Others
Bid history
No bid history
Ship name
MARIA
Type of vessel Oil Product Carrier(≤60℃)
Entrust institution ZHEJIANG SHIPPING EXCHANGE Reference price(USD) 3100000
State of the auction First auction Auction date 2020-01-16
Ship's classification Length overall(m) 100.07
Port of registry Length(m) 94.67
Molded breadth(m) 19.05 Molded depth(m) 10.50
Gross tonnage 5511.00 Reference
deadweight(t)
7063.50
Type of main engine YANMA 8N330-EN Total fixed power
(KW / h)
3310.00
Shipyard Completion date 2011-01-15
Reconstruction
shipyard
Reconstruction
completion date
Anouncement
Notice
Additional
Technical
Information
Bid history
Anouncement


 

Entrusted by the transferor, we decide to hold an online public auction on www.shipbid.net from 10:00 to 11:00 on Jan 16, 2020.

 

1. Auction Object: “MARIA” Oil Tanker

PoR: Ulaanbaatar; Original Class: Sing Class (unvalid); LOA: 100.07m; MLB: 19.05m; MLD: 10.50m; GRT: 5511; NRT: 1978; DWT: 7063.50t; ME: YANMA 8N330-EN (Zi Bo) * 1 set 9480kW; Blt: Nanjing East Star Shipbuilding Co.,Ltd . CN on Jan 15, 2011. (Data above refers to the ship inspection certificate)

Remarks: The ship is lay-up.

 

2. Bidding Rules: it has no reserved price and bids with one or more bidders. The starting price is USD 3.1 million, and the deposit is USD 0.3 million (or RMB 2.0million). Bid increase: a multiple of USD 0.01 million.

 

3. Application: Application time: from the announcing time until Beijing Time 16:00 on Jan 15, 2020 (subject to the time of deposit). After the deadline, no application will be accepted. This auction accepts the application of natural persons or companies. After expiration of this listing period, if no bidder is collected, the content shall not be changed and the listing period shall be extended with a period of 5 working days. During this period, if only one bidder is collected, the bidder shall be identified as the buyer; if two or more bidders are collected, the transfer shall be made by auction at the time specified in the announcement.

 

4. Inspection place: Fu’an Port;

Inspection time: declare later;

The ship is lay-up , please contact the auctioneer for exact inspection time.

 

5. Deposit Account:

USD Acct:

Bank: Industrial and Commercial Bank of China, Zhoushan Branch

Bank Add: No.628 Dingshen Road Lincheng Zhoushan China

SWFIT Code: ICBKCNBJZSC 

Acct: 1206020129201407315

Beneficiary: Zhoushan Yi Ge Ship Auction Co., Ltd

 

RMB Acct:

Beneficiary:浙江船舶交易市场有限公司

Acct1206020109200087908

Bank:工商银行舟山市营业部

 

6. Contacts: 0580-2027516 Mrs Ye, 0580-2038333 Mr Zhou.



Zhejiang Shipping Exchange Co., Ltd.

Zhoushan Yi Ge Ship Auction Co., Ltd.

Jan 07, 2020

Notice

Article 1 Bidding Rules is made by relevant laws, regulations and policies of our Country and with Shipbid practical situations, to standardize the bidding behaviors, maintain an open, fair and equal transaction order, and protect legitimate rights and interests for all the parties involved.

Article 2 The Transaction Rules of the ship bidding (hereafter to be referred as bidding) is suitable for standardizing all the online bidding behaviors. All the parties involved should abide by the Rules and bear legal responsibilities for their own behaviors.

Article 3 All legal personalities, natural persons and other organizations in and abroad PRC can participate in the bidding only if they have the qualifications of the auction announcement except those provided by laws and regulations.

Article 4 The auction announcement and other documents are formulated by the auctioneer.

Article 5 The auction information including videos, pictures and written introductions offered by the Seller will be uploaded through the Shipbid system after verified by the auctioneer.

Article 6 The Seller shall take all the legal responsibilities and economic losses if he provides with fake information.

Article 7 The bidders couldn’t participate in the bidding activities until they register as the buyers through the Shipbid system.  

The passwords should be kept safely. If forgotten, bidders could retrieve through the Shipbid system. And if divulged, bidders should login in time to change the passwords.

Article 8 Before submitting the application for the bidding, the bidders should carefully read the auction announcement, ship’s information, transaction rules and other relevant documents, then login the Shipbid system to fill in true and effective information as required.

Article 9 The bidders should submit the applications in accordance with the auction announcement before the Shipbid starts.

If legal personalities, natural persons and other organizations need joint-bidding, they should fill in related information and the proportion of capital contribution of each party as required and sign the Joint Bidding Statement.

Article 10 The bidders apply on the Shipbid system by themselves, and pay the deposit either on line or offline. Foreign bidders could also apply for bidding with the Guarantee Letter of bank as the auctioneer required. One deposit is only for one lot. And if the bidders want to bid several ships at the same time, corresponding deposits are required.

The bidders are entitled to bid only if the deposit fully paid to the nominated account (based on the arrival time of the deposit) or the original Letter of Guarantee delivered to the auctioneer (based on the arrival time of the Letter of Guarantee to persons in charge) within the required time. The bidders shall not be eligible for bidding if the deposit is delayed or not fully paid or the Letter of Guarantee is not received on time.

Article 11 The bidding shall be conducted with time limit. Qualified bidders can participate in the bidding. The initial offer shall not be lower than the starting price and each offer shall be no less than the specified bid increment.

If it is an auction with reserve price, “YES” will be revealed in the system. Otherwise it will display “NULL”.

Article 12 The bidder shall make a cautious bid, and the offer will be irrevocable once submitted.

Article 13 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new bid within 5 minutes countdown, another 5 minutes will be set.

No new offers would be accepted after the final countdown, and the bidding history will be revealed.

Article 14 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder (hereinafter called the Buyer) shall be confirmed in accordance with the following rules

(1) Where there is no reserve price, the highest bidder would be the Buyer.

(2)Where there is a reserve price, the bidder with the highest offer and not lower than the reserve price would be the Buyer; If the highest offer is lower than the reserve price, the bidding will be pass.

When the time for the bidding is over, the bidding system will be automatically closed.

Article 15 The Buyer should confirm his qualification with the enterprise or individual valid certification to the auctioneer within 3 working days after the bidding. After verification and confirmation, the Buyer should sign the Purchase Confirmation.

If the Buyer's qualification is not approved, the bidding result will be invalid, the deposit would be confiscated, and the lot should be bid again. The Buyer should pay the commissions for both parties due to his breach of the contract; Also, the previous Buyer should pay the balance of price if the final purchase price is lower than the first purchase one.

Article 16 The payment of balance shall be remitted to the nominated account in time according to the Purchase Confirmation.

Article 17 The Buyer should sign the Sale and Purchase Agreement by the Purchase Confirmation with the seller within the required time and make relevant transaction procedures.

Article 18 The auctioneer should publicize the bidding results through the Shipbid system after the bidding.

Article 19 After paying the balance, the Buyer himself should handover the lot and manage the transaction procedures in time. If the Buyer fails to manage within required time, he himself should pay the costs caused by the delay and afford the consequences of possible damage or losses.

Article 20 The Buyer himself should register the lot and bear all relevant expenses occurred according to the regulations and policies during the transaction procedures.

Article 21 The bidding currency is RMB. Both the starting price and purchase price do not include the expenses and taxes occurred during transaction procedures.

Article 22 If the bidder obstruct others to bid, manipulate or monopoly the bidding price, or make malicious collusion, the auction will be cancelled once above behaviors are found, and relevant legal responsibility will be borne by the bidder.

Article 23 If the bidder cannot normally login the Shipbid system to apply, offer or bid because of following reasons such as virus invasion, hardware failure, network congestion or passwords forgotten and divulge, etc., he himself should bear the consequences and the bidding will not be suspended.

Article 24 The auctioneer reserves the right to suspend or withdraw the bidding before it starts according to the laws and regulations.

Article 25 The auctioneer reserves the right to suspend or withdraw the bidding if force majeure or accident has caused the online auction to fail.

Article 26 These rules are general rules for online auction transactions of ships. In case of any conflict with the announcement or agreement of a single item, the terms of a single item shall prevail.

The time concerned in the bidding all depends on Shipbid system service time, except the deposit arriving time which depending on the bank recording time. All the time of information arriving is subject to the time when the information received by Shipbid.

Zhejiang Shipping Exchange Co Ltd is responsible for the interpretation of the Rules.

 

Additional


 

1. This additional provision is a supplement to the bidding rules and has the same legal effect as the bidding rules.

 

2. Auction Ship:

MARIA”  Oil Tanker

PoR: Ulaanbaatar; Original Class: SING CLASS (unvalid); LOA: 100.07m; MLB: 19.05m; MLD: 10.50m; GRT: 5511; NRT: 1978; DWT: 7063.50t; ME: YANMA 8N330-EN (Zi Bo) * 1 set 3310kW; Blt: Nanjing East Star Shipbuilding Co. Ltd. CN on Jan 15, 2011. (Data above refers to the ship inspection certificate)

Remarks: The ship is lay-up.

The above data are recorded in the ship's inspection certificate for reference only. The bidding object is subject to the status at the time of inspection. If there is any discrepancy between the actual situation and the data above, the bidding and bidding price won’t be disturbed. Once the auction is concluded, the bidding company and the transferor shall not assume any liability for defects or quality problems of the bidding target.

3. Application

The bidders shall pay the bid deposit when signing up, and provide other documents required by the transferor or the bidding company.

 

4. After Auction

4.1 After the auction finished, the buyer must confirm the result of auction by email or fax on the same day, and signed the Purchase Confirmation with the bidding company within 2 working days after the auction.

4.2 The bid deposits of the unsuccessful bidders shall be returned within 2 working days after the auction, and the bid deposit shall not bear interest.

 

5. Transfer (cancellation) and Delivery of the Ship

5.1 The buyer must pay 20% purchase price and all the commission before 16:00 (Beijing Time) Jan 20, 2020, while the buyer must pay the balanced purchase price and ROB charge on the delivery day (the bidding deposit will be credited against part of the balanced purchase price at last payment). Any delay shall be deemed as breach of contract.

 

5.2 The original shipowner shall, within 15 working days after signing the Protocol of Delivery and Acceptance Ship, complete all the procedures of cancellation relating to the ship.

The buyer shall not start the ship or shift it to other sea areas (except for force majeure such as weather) until obtaining the ship's cancellation certificate.

The earliest delivery date: Feb 10, 2020, and the latest delivery date: Feb 28, 2020.

 

5.3 Delivery Place: 1SAP Ningde Port, CN. The transferor shall send NOR with fixed delivery time and place 10 working days ahead. The ship would deliver against the inspected condition. The buyer is deemed to confirm the ship’s condition if he did not inspect the ship at the nominated time.

 

5.4 The following documents shall be delivered by the transferor to the buyer in exchange of the Ship:

(1)     Four (4) Original Bills of Sale (in British Form 10 a), duly notarized by a notary public in Malaysia.

(2)     Original Meeting Board of Directors Resolutions of the selling company approving sale of the Ship, duly notarized by a notary public in Malaysia.

(3)     Original Power of Attorney in favor of person(s) execute the sale and signing MOA, Bill of Sale, Protocol of Delivery and Acceptance and all other documents pertaining to the sale and the delivery of the Ship to the Buyers, duly notarized by a notary public in Malaysia.

(4)     Certified true copies of the Sellers' corporate documents i.e. Articles of Incorporation, By-Laws, and of any amendments thereto.

(5)     Original Certificate of Good Standing of the Sellers issued by the appropriate HongKong Authorities dated not more than ten (10) banking days prior to the date of delivery of the Ship.

(6)     Original Certificate of Incumbency issued by the Sellers’ company, dated not more than ten (10) banking days prior to the date of delivery of the Ship.

(7)     Original Certificate of Ownership and Encumbrance for the Ship issued by the Mongolia Flag Registry dated on the delivery time. If the original cannot be provided at the closing, the Sellers shall provide a copy of the said Certificate of Ownership and Encumbrance and the original shall be provided to the Buyers within 5 working days from the date of delivery.

(8)     Letter of undertaking by the Sellers in writing signed and stamped by the authorized person to indemnify the Buyers against any maritime liens and other debts whatsoever arising prior to the time of the Delivery of the Ship to the Buyers.

(9)     One (1) original Permission for Sale and Cancellation issued by Mongolia Flag Authority and dated not more than Six (6) Working Days prior to the Delivery.

(10)  Certificate of Deletion issued by Mongolia Flag Registry no later than Ten (10) working days after issuing Protocol of Delivery and Acceptance.

(11) Any other documents as may reasonably be required, by the competent authorities of the Buyers' Nominated Flag State for the purpose of registering the ship.

 

5.5 The following documents shall be delivered by the buyer to the transferor:

(1) Certified true copy of the Buyers “Business License”. One (1) Original English translation of same.

(2) One (1) certified true copy of all the “Memorandum and Articles of Incorporation including all subsequent amendments thereto, if any”. One (1) Original English translation of same.

(3) Resolution of Buyers' Board of Directors approving the purchase of the Ship and the execution of all documents in connection therewith, duly attested by a local lawyer or notarized by local Notary Public. One (1) Original English translation of same.

(4) Power of Attorney duly attested by a local lawyer or notarized by local Notary Public. One (1) Original English translation of same.

5.6  The sales and purchases contract will be negotiated, revised and signed basis on SALEFORM 2012 made by Norwegian Shipbrokers’ Association.

 

6. Related expenses

6.1 Auction commission: After the auction is completed, the buyer must pay the bidding company 1% of the purchase price in USD as commission.

6.2 The transferor would provide with commercial invoice of the purchase price. All expenses incurred after the ship handover shall be borne by the buyer himself.

6.3 When the ship is delivered, the buyer and the transferor shall make on-site measurement of the remaining oil on the ship, and the price of oil shall refer to the last 2 days of the listed price in the Singapore Platts. On the day of delivery, the buyer shall pay for the ROB directly to the account nominated by the transferor. The transferor would provide with ROB proforma invoice.

6.4 All expenses and the custody responsibility incurred before the handover of the object ship shall be borne by the transferor; After the handover of the ship, the expenses and risks incurred by the object shall be borne by the buyer, and the custody of the object shall also be borne by the buyer.

 

7. Matters not covered herein shall be settled through negotiation by the bidding company, the transferor and buyer.

 

Zhejiang Shipping Exchange Co., Ltd.

Zhoushan Yi Ge Ship Auction Co., Ltd.

Jan 07, 2020

Technical
No content yet
Information
No content yet
Bid history
No content yet
Disclaimer:
The online ship auction doesn't declare or guarantee the correctness or reliability of any information published on the website;The risk caused that you accept and acknowledge this information shall be borne by yourself. The online ship auction has the right but not obligation to improve or correct any errors ormisunderstandings on any part of the information published.
 
 
 
Home  |  Judicial  |  State-owned  |  Others  |  Auction Announcement
TEL:+86(580)2038333;FAX:+86(580)2027516
QQ service online:869376802 Click here to send me a message
浙ICP备11020397-3号