Entrusted by the transferor (the Sellers), we have scheduled to hold a public bidding online for “HAO YING YUN 7”, and published her Bidding Announcement, Bidding Rules, Special Provisions and Technical Report on December 7th, 2023.
The bidding deposit account prescribed in the original Bidding Announcement shall be amended accordingly due to name changing of the bidding company. The original bidding deposit account in the original announcement is stated as follows:
l 户 名:浙江船舶交易市场有限公司
l 账 号:3420 0200 1012 0100 3787 39
l 开户行:浙商银行舟山分行
Adjust to:
l 户 名:浙江拍船网航运交易股份有限公司
l 账 号:3420 0200 1012 0100 3787 39
l 开户行:浙商银行舟山分行
It is noted, except for the above supplementary contents, other items in the original announcement will not be changed.
Zhejiang Shipping Exchange Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
December 26th, 2023
Bidding Announcement
Entrusted by the transferor (the Sellers),
we have scheduled to hold a public bidding online (www.shipbid.net) from 16:00
to 16:30 (Beijing time) on January 5th, 2024.
1. Bidding
Object
“HAO YING YUN 7”
IMO:9351828
Type:Tug
Class:CCS
Class Notation:★CSA Tug
★CSM
Flag:China
PoR:Ningbo
Built time:January 15th, 2007
Builder:Universal Shipbuilding
Corporation, Keihin Shipyard, Japan
LOA/Breadth/Depth:68.00m*16.40m*7.20m
Deadweight:2803.9t;Design draft:5.20m
GRT/NRT:2660/798
Next SS date:January 14th, 2027
M/E:Wartsila 9L32,2×4500kW×750r/min,Tier III
Prime
Mover of M/G:
MAN D 2876 LE 301,1×345kW×1500r/min,
Tier III
Baudouin 6M33CD484E200,1×440kW×1500r/min, Tier II
M/G:
LEROY SOMER,LSAM 472 M7/4p,1×300Kw/420V/516A
Kungfu SCI-TECH,SB-HW4.D-400,1×300Kw/415V/696A
S/G:Newage AVK,DSG 72 L2-4W,2×1200kW,420V×2062A
Prime
Mover of EMER. Generator:MAN D
0824 LE 201, 1×90kW×1500r/min
EMER. Generator:LINDENBERG,1×75kW×420V
Main
propulsion:CPP propeller,2×DIA.3600mm
Bow
thruster: Kamewa TT1850, 1×800 Kw
Stern thruster:
Kamewa TT1650, 1×590 kW
Other
parameters:
Minimum safety manning:14 persons
External fire monitor:2x600m3/h
Deck crane:TTS, 1 x
SWL 2t @14m
Deck area:380 m2
Bollard Pull:156t
Shark jaw:1xSWL 350t
Towing winch:Brattvaag
SL300/ BSL300W
FO tank:1883.53m3;
DO tank:208.76m3; FW tank:193.95m3;
BW tank:978.45m3
All the information and
data refer to the Vessel provided in this Announcement as well as the
attachments are for reference only. If there is any discrepancy, the class
certificates and trading certificates and actual ship status shall prevail.
2. Bidding
rules
2.1 This bidding will be held
without a reserved price. If only one bidder is collected, the bidder
shall be identified as the Buyers; If there are two or more bidders
participating in the bidding, the potential transfer of the ship will be
carried out by auction. No one has the preemptive right to the transfer of
Vessel.
2.2 The starting price is RMB 38.00million,
and the bidding deposit is RMB5million (or USD0.7million); Bid increment is a
multiple of RMB0.05million.
2.3 The bidding time
will enter into Extension Cycle since 16:25 on January 5th, 2024
(Beijing Time) after the bidding officially starts. And then the ending time
will be refreshed to 5 minutes once each new bidding price offered.
2.4 The
bidding deposits of the unsuccessful bidders shall be returned within
2 working days after the bidding without interests.
2.5 The time of this
auction activity shall be subject to Beijing time (unless otherwise expressly
stated).
3.
Registration requirements
3.1
Registration is available from the date of this Announcement and ends before
the auction starts (subject to the receipt of bidding deposit, the
completion of online registration and the receipt of the bid number plate
obtained on the platform. It is recommended that bidders pay the deposit 1-2
days in advance in order to avoid any issues resulting in missing the auction).
No registration will be accepted after the deadline. After successful
registration, the bidder shall be deemed to have fully known, accepted and
complied with the contents of this announcement, bidding rules, special
provisions and relevant agreements.
3.2 Any
natural persons with full civil capacity in China and corporation or
organization in and outside the People’s Republic of China with full capacity
for civil conduct and legally existing may participate in this bidding.
The
bidder shall not subject to or affected by any sanction, embargoes, freezing
provisions, prohibitions or other restriction relating to trading, doing
business, investment, exporting, financing or making assets available (or other
activities similar to or connected with any of the foregoing) imposed by law or
regulation of the United Nations, the People's Republic of China, United States
of America and European Union against any state, natural or legal person, body
or entity and are capable of making the payments in US Dollars as required
under this Agreement.
3.3 The
bidder shall submit the following documents for registration (including but not
limited to):
(1)
For domestic bidders:
l 营业执照扫描件(加盖公章);
l 法定代表人身份证扫描件(加盖公章);
l 经办人身份证扫描件及授权委托书(如有,需加盖公章);
l 《参拍承诺书》(文本向拍卖人索取)
l 竞拍保证金付款凭证
(2)
For overseas bidders:
l Certificate of Incorporation
l Articles of Incorporation
l Copy of Director’s Passport
l Undertaking for Bidding (Letter to be provided by the
Auction Company)
l Bank slip of bidding deposit
4. Date
and Place for Inspection of the Vessel
Inspection
place is to be determined (according to specific voyage and port arrangement,
and we will issue the notice in advance if possible) please confirm with the
bidding company for details. Potential bidders can inspect the Vessel within
the stipulated time. The risk and expenses in relation to the inspection shall
be borne by the potential bidders. The bidding company and the Sellers shall
only be responsible for coordination work. Potential bidders who fail to
participate in the on-site inspection yet complete the registration procedure
within the prescribed inspection time shall be deemed to have recognized and
accepted the status quo and defects of the Vessel, including but not limited to
all known and unknown defects related to the vessel certificates and the vessel
condition, etc. Potential bidders shall not object to defects, such as the
quality, of the Vessel for any reason.
5.
Account of Bidding Company
(1) RMB
ACCOUNT:
l 户 名:浙江船舶交易市场有限公司
l 账 号:3420 0200 1012 0100 3787 39
l 开户行:浙商银行舟山分行
(2) USD ACCOUNT:
l Beneficiary:
Zhejiang Shipping Exchange Co., Ltd.
l Beneficiary Address: 6th Floor, Zhoushan Bulk Commodity Exchange Center
No. 555 Wengshan Road Lincheng,
Zhoushan City, Zhejing, P.R.China
l Account No. : 3420 0200 1142 0100 0321 30
l SWIFT (Beneficiary Bank): ZJCBCN2N
l Beneficiary Bank: China Zheshang Bank
l Beneficiary Bank Address: No.88,Lv Dao Road, Dinghai Dist., Zhoushan City,
Zhejiang Prov., P.R. China
l Remittance Reference: HAO YING YUN 7
6.
Contacts
Mr. Gao:
+86 18058087033/ 0580-2038333
Ms. Wen:
+86 18058087023/ 0580-2038333
Mr.
Chen: +86 18058087030/ 0580-2027516
Email: auction@shipbid.net
Zhejiang
Shipping Exchange Co., Ltd.
Zhoushan
Yi Ge Ship Auction Co., Ltd.
December 7th, 2023
Article 1 Bidding Rules is made by relevant laws, regulations and policies of the People's Republic of China and with Shipbid practical situations, to standardize the bidding behaviors, maintain an open, fair and equal transaction order, and protect legitimate rights and interests for all the parties involved.
Article 2 The Transaction Rules of the ship bidding (hereafter to be referred as bidding) is suitable for standardizing all the online bidding behaviors. All the parties involved should abide by the Rules and bear legal responsibilities for their own behaviors.Disputes, if any, shall be settled by the parties through friendly negotiation. If the negotiation fails,parties concerned may file a lawsuit with the people's court where the auction organizer (Zhejiang Ship Exchange Market Co.,Ltd) is located.
Article 3 All legal persons or organizations that exist legally can participate in the bidding only if they have the qualifications of the auction announcement except those provided by laws and regulations.
Article 4 The auction information including videos, pictures and written introductions offered by the Seller will be uploaded through the Shipbid system after verified by the auctioneer.
The Seller shall take all the legal responsibilities and economic losses if he provides with fake information.
Article 5 The bidders couldn’t participate in the bidding activities until they register as the buyers through the Shipbid system.
The username and passwords should be kept safely. If forgotten, bidders could retrieve through the Shipbid system. And if divulged, bidders should login in time to change the passwords.
Article 6 Before submitting the application for the bidding, the bidders should carefully read the auction announcement, ship’s information, transaction rules and other relevant documents, then login the Shipbid system to fill in true and effective information as required.
Article 7 The bidders should submit the applications in accordance with the auction announcement before the Shipbid starts.If legal personalities, natural persons and other organizations need joint-bidding, they should fill in related information and the proportion of capital contribution of each party as required and sign the Joint Bidding Statement.
Article 8 The bidders apply on the Shipbid system by themselves, and pay the deposit either on line or offline. One deposit is only for one lot. And if the bidders want to bid several ships at the same time, corresponding deposits are required.
The bidders are entitled to bid only if the deposit fully paid to the nominated account (based on the arrival time of the deposit )within the required time. The bidders shall not be eligible for bidding if the deposit is delayed or not fully paid on time.
Article 9 The bidding shall be conducted with time limit. Qualified bidders can participate in the bidding. The initial offer shall not be lower than the starting price and each offer shall be no less than the specified bid increment.
If it is an auction with reserve price, “YES” will be revealed in the system. Otherwise it will display “NULL”.
Article 10 The bidder shall make a cautious bid, and the offer will be irrevocable once submitted.
Article 11 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new bid within 5 minutes countdown, another 5 minutes will be set.
No new offers would be accepted after the final countdown, and the bidding history will be revealed.
Article 12 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder (hereinafter called the Buyer) shall be confirmed in accordance with the following rules
(1) Where there is no reserve price, the highest bidder would be the Buyer.
(2)Where there is a reserve price, the bidder with the highest offer and not lower than the reserve price would be the Buyer; If the highest offer is lower than the reserve price, the bidding will be pass.
When the time for the bidding is over, the bidding system will be automatically closed.
Article 13 The Buyer should confirm his qualification with the enterprise or individual valid certification to the auctioneer within 2 working days after the bidding. After verification and confirmation, the Buyer should sign the Purchase Confirmation. If the buyer fails to sign the Auction Transaction Confirmation for reasons, the auction result shall not be affected.
If the buyer fails to pass the qualification due to submitting false registration materials, the bidding result is invalid or the buyer breaches the contract, he shall pay the bidding service fee of both the buyers and the sellers; If the price of the re-auction is lower than the transaction amount, the buyer must make up the difference.
Article 14 If the Buyers do not pay the balance of Purchase Price within the prescribed time or do not take the bidding object, the Sellers are entitled to bid again of which the original Buyers cannot partiticate. If the Buyers regret to bid after completion of the auction (including but not limited to failure to pay the balance Purchase Price 2 working days prior to delivery, or other circumstances the original Buyers express clearly ), the bidding deposit lodged shall not be refunded, and will be used to pay the cost loss caused by the first bidding, make up the difference between the re-bidding price and the first bidding price. If the deposit amount is insufficient cover the costs, the Sellers have the right to pursue recourse against the original Buyers.
Article 15 The payment of balance shall be remitted to the nominated account in time according to the Purchase Confirmation.
Article 16 The Buyer should sign the Sale and Purchase Contract by the Purchase Confirmation with the seller within the required time and make relevant transaction procedures.
Article 17 After paying the balance, the Buyer himself should handover the lot and manage the transaction procedures in time. If the Buyer fails to manage within required time, he himself should pay the costs caused by the delay and afford the consequences of possible damage or losses.
Article 18 The Buyer himself should register the lot and bear all relevant expenses occurred according to the regulations and policies during the transaction procedures.
Article 19 The bidding currency is RMB. Both the starting price and purchase price do not include the expenses and taxes occurred during transaction procedures.
Article 20 If the bidder obstruct others to bid, manipulate or monopoly the bidding price, or make malicious collusion, the auction will be cancelled once above behaviors are found, and relevant legal responsibility will be borne by the bidder.
Article 21 If the bidder cannot normally login the Shipbid system to apply, offer or bid because of following reasons such as virus invasion, hardware failure, network congestion or passwords forgotten and divulge, etc., he himself should bear the consequences and the bidding will not be suspended.
Article 22 The auctioneer reserves the right to suspend or withdraw the bidding before it starts according to the laws and regulations.
Article 23 The auctioneer reserves the right to suspend or withdraw the bidding if force majeure or accident has caused the online auction to fail.
Article 24 The seller and the auctioneer shall not bear any responsibility for the abnormal service of the website or the interruption of the auction activity due to force majeure or any third party. After that, the auctioneer will issue a supplementary announcement and explain the reasons for the interruption. A new auction announcement will be issued 阿as soon as possible the website service returns to normal, and the online auction will be organized and completed according to the new auction announcement. The starting price and reserve price (if any) for re-organizing the bidding due to the above reasons shall be consistent with the original announcement.
Article 25 These rules are general rules for online auction transactions of ships. In case of any conflict with the announcement or agreement of a single item, the terms of a single item shall prevail.
Article 26 If the bidding announcement, additional provision, inspection report or technical status report of the subject object is described and publicized in Chinese and English (or other languages), in case of contradiction or inconsistency, The Chinese version shall prevail.
Article 27 If the person with the right of preemption participates in the bidding, he/she shall submit legal and effective certificates to the auctioneer before the auction begins. After the auctioneer confirms the qualification, he/she can obtain the right of preemption to participate in the bidding. If he/she fails to submit within the time limit, he/she shall be deemed to have given up the right of preemption of the subject matter.
Article 28 The time concerned in the bidding all depends on Shipbid system service time, except the deposit arriving time which depending on the bank recording time. All the time of information arriving is subject to the time when the information received by Shipbid.
Zhejiang Shipping Exchange Co Ltd is responsible for the interpretation of the Rules
1. This additional provision is a supplement to the bidding
announcement and rules, which has the same legal effect.
2. Bidding Object
“HAO YING YUN 7”
IMO:9351828
Type:Tug
Class:CCS
Class Notation:★CSA Tug
★CSM
Flag:China
PoR:Ningbo
Built time:January 15th, 2007
Builder:Universal Shipbuilding
Corporation, Keihin Shipyard, Japan
LOA/Breadth/Depth:68.00m*16.40m*7.20m
Deadweight:2803.9t;Design draft:5.20m
GRT/NRT:2660/798
Next SS date:January 14th, 2027
M/E:Wartsila 9L32,2×4500kW×750r/min,Tier III
Prime
Mover of M/G:
MAN D 2876 LE 301,1×345kW×1500r/min,
Tier III
Baudouin 6M33CD484E200,1×440kW×1500r/min, Tier II
M/G:
LEROY SOMER,LSAM 472 M7/4p,1×300Kw/420V/516A
Kungfu SCI-TECH,SB-HW4.D-400,1×300Kw/415V/696A
S/G:Newage AVK,DSG 72 L2-4W,2×1200kW,420V×2062A
Prime
Mover of EMER. Generator:MAN D
0824 LE 201, 1×90kW×1500r/min
EMER. Generator:LINDENBERG,1×75kW×420V
Main
propulsion:CPP propeller,2×DIA.3600mm
Bow
thruster: Kamewa TT1850, 1×800 Kw
Stern thruster:
Kamewa TT1650, 1×590 kW
Other
parameters:
Minimum safety manning:14 persons
External fire monitor:2x600m3/h
Deck crane:TTS, 1 x
SWL 2t @14m
Deck area:380 m2
Bollard Pull:156t
Shark jaw:1xSWL
350t
Towing winch:Brattvaag
SL300/ BSL300W
FO tank:1883.53m3; DO tank:208.76m3; FW tank:193.95m3; BW tank:978.45m3
All the information and data provided in the Bidding Announcement,
Special Provision, Technical Report as well as any other channel related to the
Vessel are for reference only. The bidding object is subject to the status at
the time of delivery. If there is any discrepancy between the actual situation
and the information and data above shall not affect the bidding and bidding
price. Once the bidding is concluded, the Sellers and us shall not assume take any
liability for defects or quality problems of the bidding vessel.
3. After Bidding
3.1 After a successful bidding, the Buyers shall sign an Auction
Confirmation with the Bidding Company on the same day (the “Bidding Day”) by
email or facsimile. The Buyers shall sign an original Auction Confirmation with
the Bidding Company within two (2) working days of the Bidding Day.
3.2 The sales and purchases contract (MOA)
shall be signed as attached. In principle, no modification of the MOA will be
allowed, except filling with the necessary information (e.g. Buyers'
information, purchase price, signing date, etc.), or others terms mutually
agreed between the Sellers and the Buyers. In the event of any conflict or
ambiguity between MOA and this public auction regulations (including the
bidding Announcement, bidding rules, special provision, etc), the terms in such
public notice shall prevail.
The Buyers shall sign the sales and purchases
contract (MOA) with the Sellers within Three (3) working days after
signing Auction Confirmation.
3.3 It’s acknowledged the account designated by the bidding company is
the escrow account for the Buyers and Sellers to hold and release the funds of
the Purchase Price without interests and the Escrow Agreement shall be
signed by the Buyers, the Sellers and the Bidding Company on the same day of
signing MOA. The bidding company does not charge any additional fees for the
fund custody services related to this project, and all the custody funds are
free of interest.
The bidding deposit paid by the Buyers shall be automatically converted
to the purchase deposit with the deduction of the bidding service fee after the
MOA and the Escrow Agreement signed.
3.4 The Purchase Price shall be settled in CNY. If the Buyers are of an
overseas enterprise, the Purchase Price shall be exchanged against the middle
exchange rate announced by the Bank of China on the bidding day. At
the same time, both the Sellers and the Buyers shall jointly appoint the export
agent designated by the auction company for exporting matters. The Sellers
shall be responsible for exporting matters, and the export-related expenses
shall be borne by the Buyers. Port disbursement before delivery (if any) shall
be borne by the Sellers, while that after delivery to be for the Buyers’
account.
3.5 If the Buyers fail to sign the Auction
Confirmation or the Sales and Purchase Contract in Chinese (or the MOA in
English) as scheduled, the Sellers shall be entitled to confiscate
all the bidding deposit but without prejudice to the Sellers’ right to claim
their losses against the Buyers. The bidding company shall release the bidding
deposit with the deduction of bidding service fee to the Sellers.
3.6 And if the escrow account is failed to open due to the Buyers’
reasons, or the Buyers fail to pay the balance of purchase price on time, the
Sellers shall have the right to cancel the MOA and the MOA shall be null and
void. The Sellers shall be entitled to confiscate all the bidding deposit
but without prejudice to the Sellers’ right to claim their losses against the
Buyers. Zhejiang Shipping Exchange Co., Ltd. shall have the right to
re-organize the bidding activity for the object Vessel against the instructions
of the Sellers.
4. Transfer (Deletion) and Delivery of the Vessel
4.1 The Buyers shall pay the bidding service fee no later than 16:00 on
January 9th, 2024 (Beijing Time). And the Buyers shall remit the balance of the
Purchase Price, estimated ROB charge and other delivery money (if any) to
the escrow account, at least TWO (2) working days prior to the Vessel’s
expected delivery date. Any delay or failure to pay fees mentioned above shall
be deemed as a breach of the Bidding Announcement and the MOA.
4.2 The
original owner (as the Sellers) should complete all the deletion procedures
relating to the Vessel within 10 working days after the original Protocol of
Delivery and Acceptance signed, dated and timed arrive at the Sellers.
Notice
of Readiness shall not be tendered before: January 20th, 2024
The
Latest Delivery Date: February 29th, 2024
If the
Delivery indeed has to be postponed due to other emergencies and force majeure
factors, a new Latest Delivery Date should be mutually agreed by the Sellers
and the Buyers.
4.3
Delivery Place: The Vessel shall be delivered and taken over by the Buyers on
an “as is where is” basis safely afloat at a safe and accessible berth or
anchorage Zhoushan port, China at the Sellers’ option. The Sellers shall send
the notice with intended delivery time and place 10 days in advance.
The
Buyers shall be deemed to accept the vessel’s condition if they did not inspect
the vessel within the prescribed inspection time. Once the bidders complete the
registration procedures and participates in the bidding, it shall be deemed to
have fully understood all the information of the subject matter of the bid,
including but not limited to all known and unknown defects related to the
vessel certificate, vessel condition, etc. The Buyers shall not raise
objections to the defects such as the quality of the bid target for any
reason.
5. Related Expenses
5.1 Bidding service fee: After the successful bidding, the Buyers shall
pay the bidding company 1% of the Purchase Price as bidding service fee.
5.2 The bank charges related to the bidding deposit shall be borne by
the bidders; and the bank charges related to the purchase price shall be borne
by the Buyers.
5.3 On
delivery, the Buyers and the Sellers shall take measurement of the remaining
bunkers and unused lubricating. The Buyers shall take over remaining unused
lubricating and hydraulic oils and grease in storage tanks and unopened drums
and pay:
(a) the
last actual net price (excluding taxes) as evidenced by invoices or vouchers;
or if such invoices or vouchers not available, the latest price
for Shanghai Port (excluding taxes) published by CHIMBUSCO prior to the date of
delivery.
The
Buyers shall take over the remaining bunkers at:
(b) the
last actual net price as evidenced by invoices or vouchers; or if not
available from the Sellers, the price published by the same makers of the oils on
the 4th business day prior to the delivery date shall be applied.
5.4 The Vessel with everything belonging to her shall be at the Sellers'
risk and expense until she is delivered to the Buyers, while the Vessel’s risk
and expenses shall be for the Buyers’ account after signing Protocol of
Delivery and Acceptance under this Agreement. If there are other agreements in
the MOA, the agreement in the MOA signed by the Buyers and Sellers shall
prevail.
6. The announcement in
Chinese and English respectively, in the event of any discrepancies between the
Chinese and English versions, the Chinese version shall prevail.
7. Matters not covered
herein shall be settled through negotiation by the bidding company, the Sellers
and the Buyers.
Zhejiang
Shipping Exchange Co., Ltd.
Zhoushan
Yi Ge Ship Auction Co., Ltd.
December 7th, 2023
Status |
Bidder |
Price(CNY) |
Time |
|
| 192 | ¥38000000 | 2024-01-05 16:05:00 |