Entrusted by the transferor (the Sellers),
we have scheduled to hold a public bidding online (www.shipbid.net) from 10:00
to 10:30 (Beijing time) on March 12th,2024.
1. Bidding Object
“ZJ2024-022”
Type:AHTS
Class:ZC
PoR:Yantai
Trading Area:offshore
Built time:December
20th, 2010
Builder:Wuhan
Second Shipyard
LOA/Breadth/Depth:53.30m*11.58m*4.42m
DWCC:459t
Light weight: 772.25t
Draft: 3.5m
GRT/NRT:768/430
M/E:Daihatsu 6DL-28,2×1471kW×720r/min
Main propulsion:FPP
propeller
Bow thruster: KT-34, 1×125 kW
Other parameters:
Minimum safety manning:9 persons
Deck area:210m2
External fire-fighting equipment: 2 fire
monitors,2*1500 m3/h
Bollard Pull:500KN
FO tank:305.47m3; LO
tank:4.24m3; FW tank:256.78m3;
BW tank:178.31m3
All the information and data refer to the
Vessel provided in this Announcement as well as the attachments are for
reference only. If there is any discrepancy, the class certificates and trading
certificates and actual ship status shall prevail.
2. Bidding rules
2.1 This bidding will be held without a
reserved price. If only one bidder is collected, the bidder shall be
identified as the Buyers; If there are two or more bidders participating in the
bidding, the potential transfer of the ship will be carried out by auction. No
one has the preemptive right to the transfer of Vessel.
2.2 The starting price is RMB 20 million,
and the bidding deposit is RMB 2 million (or USD0.3million); Bid increment is a
multiple of RMB0.02million.
2.3 The bidding time will enter into Extension
Cycle since 10:25 on the bidding date (Beijing Time) after the bidding
officially starts. And then the ending time will be refreshed to 5 minutes once
each new bidding price offered.
2.4 The time of this auction activity
shall be subject to Beijing time (unless otherwise expressly stated).
2.5 If no qualified bidders are collected
after the expiration of this announcement, the announcement content will not be
changed and will be extended in a cycle of 5 working days.
3. Registration requirements
3.1 Registration is available from the date
of this Announcement and ends before the auction starts (subject to the receipt
of bidding deposit, the completion of online registration and the receipt
of the bid number plate obtained on the platform. It is recommended that
bidders pay the deposit 1-2 days in advance in order to avoid any issues
resulting in missing the auction). No registration will be accepted after the
deadline. After successful registration, the bidder shall be deemed to have
fully known, accepted and complied with the contents of this announcement,
bidding rules, special provisions and relevant agreements.
3.2 Any natural persons with full civil
capacity in China and corporation or organization in and outside the People’s
Republic of China with full capacity for civil conduct and legally existing may
participate in this bidding.
3.3 The bidder shall submit the following
documents for registration (including but not limited to):
(1) For domestic bidders:
●营业执照扫描件(加盖公章);
● 法定代表人身份证扫描件(加盖公章);
● 经办人身份证扫描件及授权委托书(如有,需加盖公章);
●《参拍承诺书》(文本向拍卖人索取)
● 竞拍保证金付款凭证
(2) For overseas bidders:
●Certificate of
Incorporation
●Articles of
Incorporation
●Copy of Director’s
Passport
●Undertaking for
Bidding
●Bank slip of
bidding deposit
4. Date and Place for Inspection of the
Vessel
Inspection place is to be determined
(according to specific voyage and port arrangement, and we will issue the
notice in advance if possible) please confirm with the bidding company for
details. Potential bidders can inspect the Vessel within the stipulated time.
The risk and expenses in relation to the inspection shall be borne by the
potential bidders. The bidding company and the Sellers shall only be
responsible for coordination work. Potential bidders who fail to participate in
the on-site inspection yet complete the registration procedure within the
prescribed inspection time shall be deemed to have recognized and accepted the
status quo and defects of the Vessel, including but not limited to all known
and unknown defects related to the vessel certificates and the vessel
condition, etc. Potential bidders shall not object to defects, such as the
quality, of the Vessel for any reason.
5. Account of Bidding Company
(1) RMB ACCOUNT:
●户名:舟山易舸船舶拍卖有限公司
●账号:3420020010120100378870
●银行:浙商银行舟山分行
(2) USD ACCOUNT:
●Beneficiary:
Zhejiang Shipping Exchange Co., Ltd.
●Beneficiary
Address: 6th Floor, Zhoushan Bulk Commodity Exchange Center, No.555 Wengshan
Rd, Lincheng Zhoushan Zhejiang Province, P.R.China
●Account No. :
3309040160000036851
●SWIFT (Beneficiary
Bank): HZCBCN2HZSB
●Beneficiary Bank:
Bank of Hangzhou Co., Ltd, Zhoushan Branch
●Beneficiary Bank
Address: No.619, Dingshen Road, Ganghang Building B Zone, Zhoushan city,
Zhejiang Prov. P.R. China
●Remittance
Reference:ZJ2024-022
6. Contacts
Mr. Zhou: +86 18058087036/ 0580-2038882
Mr. Chen: +86 18058087030/ 0580-2027516
Email: auction@shipbid.net
Zhejiang Shipping Exchange Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
February 27th, 2024
Article 1 Bidding Rules is made
by relevant laws, regulations and policies of the People's Republic of China
and with Shipbid practical situations, to standardize the bidding behaviors,
maintain an open, fair and equal transaction order, and protect legitimate
rights and interests for all the parties involved.
Article
2 The Transaction Rules of the ship bidding (hereafter to be referred as
bidding) is suitable for standardizing all the online bidding behaviors. All
the parties involved should abide by the Rules and bear legal responsibilities
for their own behaviors.Disputes, if any, shall be settled by the parties
through friendly negotiation. If the negotiation fails,parties concerned may
file a lawsuit with the people's court where the auction organizer (Zhejiang
Ship Exchange Market Co.,Ltd) is located.
Article 3 All legal persons or
organizations that exist legally can
participate in the bidding only if they have the qualifications of the auction
announcement except those provided by laws and regulations.
Article
4 The auction information including videos, pictures and written introductions
offered by the Seller will be uploaded through the Shipbid system after
verified by the auctioneer.
The
Seller shall take all the legal responsibilities and economic losses if he
provides with fake information.
Article
5 The bidders couldn’t participate in the bidding activities until they register
as the buyers through the Shipbid system.
The
username and passwords should be kept safely. If forgotten, bidders could
retrieve through the Shipbid system. And if divulged, bidders should login in
time to change the passwords.
Article
6 Before submitting the application for the bidding, the bidders should
carefully read the auction announcement, ship’s information, transaction rules
and other relevant documents, then login the Shipbid system to fill in true and
effective information as required.
Article
7 The bidders should submit the applications in accordance with the auction
announcement before the Shipbid starts.If
legal personalities, natural persons and other organizations need
joint-bidding, they should fill in related information and the proportion of
capital contribution of each party as required and sign the Joint Bidding
Statement.
Article
8 The bidders apply on the Shipbid system by themselves, and pay the deposit
either on line or offline. One deposit is only for one lot. And if the bidders
want to bid several ships at the same time, corresponding deposits are
required.
The
bidders are entitled to bid only if the deposit fully paid to the nominated
account (based on the arrival time of the deposit )within the required time.
The bidders shall not be eligible for bidding if the deposit is delayed or not
fully paid on time.
Article
9 The bidding shall be conducted with time limit. Qualified bidders can
participate in the bidding. The initial offer shall not be lower than the
starting price and each offer shall be no less than the specified bid
increment.
If
it is an auction with reserve price, “YES” will be revealed in the system.
Otherwise it will display “NULL”.
Article
10 The bidder shall make a cautious bid, and the offer will be irrevocable once
submitted.
Article
11 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new
bid within 5 minutes countdown, another 5 minutes will be set.
No
new offers would be accepted after the final countdown, and the bidding history
will be revealed.
Article
12 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder
(hereinafter called the Buyer) shall be confirmed in accordance with the
following rules
(1)
Where there is no reserve price, the highest bidder would be the Buyer.
(2)Where
there is a reserve price, the bidder with the highest offer and not lower than
the reserve price would be the Buyer; If the highest offer is lower than the
reserve price, the bidding will be pass.
When
the time for the bidding is over, the bidding system will be automatically
closed.
Article 13 The Buyer should
confirm his qualification with the enterprise or individual valid certification
to the auctioneer within 2 working days after the bidding. After verification
and confirmation, the Buyer should sign the Purchase Confirmation. If the buyer
fails to sign the Auction Transaction Confirmation for reasons, the auction
result shall not be affected.
If the buyer fails to pass the
qualification due to submitting false registration materials, the bidding
result is invalid or the buyer breaches the contract, he shall pay the bidding
service fee of both the buyers and the sellers; If the price of the re-auction
is lower than the transaction amount, the buyer must make up the difference.
Article 14 If the bidding is
completed, but the transaction is suspended or terminated, if there is a
dispute between the buyer and the seller, the auction deposit shall be properly
kept by Zhejiang Shipping Exchange Market until it is paid according to the
settlement agreement between the two parties or the effective court judgment or
the ruling of the arbitration institution.
Article
15 The payment of balance shall be remitted to the nominated account in time
according to the Purchase Confirmation.
Article
16 The Buyer should sign the Sale and Purchase Contract by the Purchase
Confirmation with the seller within the required time and make relevant
transaction procedures.
Article
17 After paying the balance, the Buyer himself should handover the lot and
manage the transaction procedures in time. If the Buyer fails to manage within
required time, he himself should pay the costs caused by the delay and afford
the consequences of possible damage or losses.
Article
18 The Buyer himself should register the lot and bear all relevant expenses
occurred according to the regulations and policies during the transaction
procedures.
Article
19 The bidding currency is RMB. Both the starting price and purchase
price do not include the expenses and taxes occurred during transaction
procedures.
Article
20 If the bidder obstruct others to bid, manipulate or monopoly the bidding
price, or make malicious collusion, the auction will be cancelled once above
behaviors are found, and relevant legal responsibility will be borne by the
bidder.
Article
21 If the bidder cannot normally login the Shipbid system to apply, offer or
bid because of following reasons such as virus invasion, hardware failure,
network congestion or passwords forgotten and divulge, etc., he himself should
bear the consequences and the bidding will not be suspended.
Article
22 The auctioneer reserves the right to suspend or withdraw the bidding before
it starts according to the laws and regulations.
Article
23 The auctioneer reserves the right to suspend or withdraw the bidding if
force majeure or accident has caused the online auction to fail.
Article
24 The seller and the auctioneer shall not bear any responsibility for the abnormal
service of the website or the interruption of the auction activity due to force
majeure or any third party. After that, the auctioneer will issue a
supplementary announcement and explain the reasons for the interruption. A new
auction announcement will be issued until the website service returns to
normal, and the online auction will be organized and completed according to the
new auction announcement.
Article
25 These rules are general rules for online auction transactions of ships. In
case of any conflict with the announcement or agreement of a single item, the
terms of a single item shall prevail.
Article 26 If the bidding announcement, additional provision,
inspection report or technical status report of the subject object is described
and publicized in Chinese and English (or other languages), in case of
contradiction or inconsistency, The Chinese version shall prevail.
Article 27 If the person with the right of preemption
participates in the bidding, he/she shall submit legal and effective certificates
to the auctioneer before the auction begins. After the auctioneer confirms the
qualification, he/she can obtain the right of preemption to participate in the
bidding. If he/she fails to submit within the time limit, he/she shall be
deemed to have given up the right of preemption of the subject matter.
Article 28 The time concerned in the
bidding all depends on Shipbid system service time, except the deposit arriving
time which depending on the bank recording time. All the time of information
arriving is subject to the time when the information received by Shipbid.
Zhejiang
Shipping Exchange Market Co Ltd is responsible for the interpretation of the
Rules.
1. This additional provision is a
supplement to the bidding announcement and rules, which has the same legal
effect.
2. Bidding Object
“ZJ2024-022”
Type:AHTS
Class:ZC
PoR:Yantai
Trading Area:offshore
Built time:December
20th, 2010
Builder:Wuhan
Second Shipyard
LOA/Breadth/Depth:53.30m*11.58m*4.42m
DWCC:459t
Light weight: 772.25t
Draft: 3.5m
GRT/NRT:768/430
M/E:Daihatsu 6DL-28,2×1471kW×720r/min
Main propulsion:FPP
propeller
Bow thruster: KT-34, 1×125 kW
Other parameters:
Minimum safety manning:9 persons
Deck area:210m2
External fire-fighting equipment: 2 fire
monitors,2*1500 m3/h
Bollard Pull:500KN
FO tank:305.47m3;
LO tank:4.24m3; FW tank:256.78m3;
BW tank:178.31m3
All the information and data provided in
the Bidding Announcement, Special Provision, Technical Report as well as any
other channel related to the Vessel are for reference only. The bidding object
is subject to the status at the time of inspection. If there is any discrepancy
between the actual situation and the information and data above shall not
affect the bidding and bidding price. Once the bidding is concluded, the
Sellers and us shall not assume take any liability for defects or quality
problems of the bidding vessel.
3. After Bidding
3.1 After a successful bidding, the Buyers
shall sign an Auction Confirmation with the Bidding Company on the same day
(the “Bidding Day”) by email or facsimile. The Buyers shall sign an original
Auction Confirmation with the Bidding Company within two (2) working days of
the Bidding Day. And sign Sales and Purchase Contract (or MOA) with the Sellers
within Seven (3) Banking Days (no later than THREE (3) Banking Days before
delivery) after bidding.
3.2 After the signing of the vessel’s Sales
Contract (or MOA), the auction deposit paid by the Buyers shall be
automatically converted into the vessel’s purchase deposit under the Sales
Contract (or MOA).
3.3 The bidding deposits of the
unsuccessful bidders shall be returned within TWO (2) Banking Days after the
bidding without interest.
3.4 It’s acknowledged the CNY or USD
account designated by the bidding company as the escrow account for the Buyers
and Sellers to hold and release the funds of the Purchase Price without interests.
The Buyers shall remit the balance of the Purchase Price, estimated ROB charge
and other delivery monies (if any) to the escrow account, at least TWO (2)
working days prior to the Vessel’s expected delivery date. Any delay or failure
to pay fees mentioned above shall be deemed as a breach of the Bidding
Announcement and the MOA.
Our company shall promptly notify the Sellers
after receiving the full payment from the Buyers, and shall pay 30% of the ship
price to the account designated by the Sellers on the day of delivery; The
remaining ship price, estimated ROB charge and handover miscellaneous charges
(if any) shall be released to the account designated by the sellers within 3
working days after receiving the PODA, the Ship Payment Release Letter and the
original or scanned copy of the ship ownership cancellation certificate
provided by the Sellers.
Our company does not charge any additional
fees for the fund custody services related to this project, and all the custody
funds are free of interest.
3.5 The Purchase Price shall be settled in
CNY. If the Buyers are of an overseas enterprise, they shall pay the
USD price in full on time according to the bidding price, and the agent company
shall handle the bank exchange settlement on the date of delivery (The
exchange rate shall refer to the bank's real-time spot exchange purchase price,
and the final settlement slip issued by the bank shall prevail). The Sellers
and the Buyers shall entrust the export agent nominated by the bidding company
for exporting matters, and the export-related expenses shall be borne by the
Buyers.
4. Transfer (Deletion) and Delivery of the
Vessel
4.1 The original owner (as the Sellers)
should complete all the deletion procedures relating to the Vessel within 10
working days after the original Protocol of Delivery and Acceptance signed,
dated and timed arrive at the Sellers.
Notice of Readiness shall not be tendered
before: March 20th, 2024
The Latest Delivery Date: April 30th, 2024
If the Delivery indeed has to be postponed
due to other emergencies and force majeure factors, a new Latest Delivery Date
should be mutually agreed by the Sellers and the Buyers.
4.2 Delivery Place: 1 SAP or 1 SBP of Changdao
at Shandong port, China at the Sellers’ option. The Sellers shall send the
notice with intended delivery time and place 7 days in advance.
The Sellers are not responsible for any
time and cost for the Buyers to take delivery of the vessel which shall be for
the Buyers’ account.
The vessel shall be handed over according
to the status quo at the time of inspection. When the bidders complete the
registration procedures and participates in the bidding, it shall be deemed to
have fully understood all the information of the subject matter of the bid,
including but not limited to all known and unknown defects related to the
vessel’s certificate, condition, etc. The Buyers shall not raise objections to
the defects such as the quality of the vessel for any reason. The Buyers shall
be deemed to confirm accepting the vessel’s condition if they did
not inspect the vessel at the nominated time within the prescribed inspection
time.
5. Related Expenses
5.1 Bidding service fee: After the
successful bidding, The Buyers shall pay 1% of the purchase price as the
bidding service fee no later than 16:00 on March 15th, 2024 (Beijing Time).
5.2 The bank charges related to the bidding
deposit shall be borne by the bidders; and the bank charges related to the
purchase price shall be borne by the Buyers.
5.3 In the bidding, the Sellers shall
provide the proforma invoices of the Purchase Price and the ROB Charges. All
expenses incurred after the handover of the vessel and all taxes incurred
during the transfer shall be borne by the Buyers themselves.
5.4 This auction does not contain
the remaining bunkers and other leased items stored with the ship (if
any). On delivery, the Buyers and the Sellers shall take measurement of
the remaining bunkers and unused lubricating oils. The Buyers shall take over
remaining bunkers and unused lubricating and hydraulic oils and grease in
storage tanks and unopened drums and pay with the actual net price (exclude
barging expenses) as evidenced by invoices or vouchers; or if the invoices or
vouchers are not available, market price of chimbusco on
the two (2) business days prior to the date of delivery to be
applied.
5.5. By the delivery time of the vessel,
all expenses and custody responsibilities of the target before the handover of
the vessel shall be borne by the Selle; after the handover of the vessel, the
expenses and risk responsibilities of the target shall be borne by the Buyers,
and the custody responsibility of the target shall also be borne by the Buyers.
If there is any other agreement in the Sales and Purchase Contract (or MOA),
the agreement in the Sales and Purchase (or MOA) signed by the Buyers and the
Sellers shall prevail.
6.This Announcement is described in both
Chinese and English. In case of any discrepancy between the two languages,
Chinese version shall prevail.
7. Matters not covered herein shall be
settled through negotiation by the bidding company, the Sellers and the
Buyers.
Zhejiang Shipping Exchange Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
February 27th, 2024